Not even sure what I am looking for here but if I could get some feedback it would be great from anyone who has been in a similar position.
Signed a contract for a land and build package in early 2021, advised that costs could go up with rise and fall and accepted that. Queried why contract doesn't have an end date for the build, was told due to demand they are not putting them in. I sign the build contact for 400k for a 170 sqm 3 br 2 bath.
Fast forward to 3qtr 22 and get an email saying time to choose your selections, great I think. Then a few weeks after that I get a bill for 80k for the rise and fall clause for materials/labor etc. Obviously not happy as was told they had good suppliers and they will not be affected drastically. Turns out they and everyone else was. 80k is way more than what the going rate was at the time.
I sought legal advice and they went over the contract and found 3 points that make the rise and fall unenforceable but to negotiate with the builder in good faith to come to an agreement.
Meet the builder 4th qtr last year and we agree to a 40k split. He advises take that to your lawyer and get them to sound off on it. Lawyer draws up and addendum to the contract which the builder is now refusing to sign (removal of certain clauses etc). Advising that its not normal practice and they will not be signing it. They sent me a simple invoice saying deduction of 40k which I didn't sign and said I am needing the addendum to not open myself up to further increases (on the basis that I agree to the 40k and they just hit me with another 40k+ after for whatever they come up with).
I have instructed my lawyer to issue a final demand and obtain costs and if not met, the termination of the contract per my rights under the contract.
I am renting, the house is one of 6 and mine is in the middle so I think it is a nightmare for builders etc to do this without my buy in. The time that has passed has already made it unrealistic to live in the house as my partner and I want to look at having a child in the next year and the property is located 1 hour from her house so it wouldn't be feasible by the time the house is even built (she doesn't want to live in the area ;)
Does anyone have any experience in these situations? Do I just trust my costly lawyer? He is a good lawyer (hopefully) on a recommendation from a friend in contract law.
I am holding up the build and my new neighbors will hate me but I feel have been misguided and given lip service for the whole process and that is why I sought counsel. They are very confident that the rise and fall cannot be enforced due to some specifics. The neighbors all agreed to the increase.
40k is a lot of money, so is 80k. All I will have to show is the land which I am ok with but trying to then build between two separate blocks may be hard in the future (I have no idea). Then I think is 40k or 80k that much over 30 years of the loan? My gut says yes. Going to try pay off asap (just the land currently) but interest rate hikes are making that hard.
Any feedback? Any one had anything similar? I am happy with the 40k but they wont sign the addendum (which I am told is very basic).
Trust the process?
Just confirming, NSW?
And shared walls or independently built?